What is the lead time for order production?

For the delivery time of the production, we need to have a detailed discussion after we saw your finishing design.

For the delivery time of the production, we need to have a detailed discussion after we saw your finishing design. 

Usually, we quote lead time as following:

*The products we have stock,the lead time: 3-7 days;

*The products should produce, after you confirm the drawing: 30-40days based on we already have the mould;

*The products we should produce: 30-50 days as to quantity after the approval drawing if we don’t have the mould;

 

 